Ramallah - Ma'an - Chairman of the Energy Authority, Zafer Melhem, confirmed that the water desalination plant in Deir al-Balah will be reconnected to the electricity supply today. He explained that the water desalination plants in the Gaza and North Gaza governorates lack the energy to operate their generators, noting that the initial material losses in the electricity distribution network in the Gaza Strip due to the war of extermination amounted to more than half a billion dollars. The Energy Authority, in cooperation with the Gaza Electricity Distribution Company, has been working over the past two weeks to temporarily repair the damaged line on the Palestinian side, about 4 km long, so that electricity can be supplied to the central desalination plant in Deir al-Balah on a continuous basis, which will be able to produce twenty thousand cubic meters per day, which will help provide clean drinking water to citizens. The Energy Authority notes that it is cooperating with international bodies to pressure the occupation to restore electricity to all remaining lines to ensure the provision of electricity to citizens and all vital facilities. Source: Maan News Agency
Re-operation of the F11 power line to supply Deir al-Balah desalination plant with energy
Recent Post
US Enhances Israel’s Air Defense with Additional Patriot System
November 20, 2026
Israeli Court Extends Detention of Kamal Adwan Hospital Director
November 20, 2026
Dollar Surpasses 3.30 Shekels Mark for First Time Since October 2025
November 20, 2026
Iran Warns of Retaliation if US Targets Its Dams
November 20, 2026
Six Citizens Killed Amid Continued Israeli Violations in Gaza Strip
November 20, 2026
Beit Shemesh Municipality Opens Public Shelters Amid Security Concerns
November 20, 2026